Powder Recovery Section

1. After Filter for Mono-Cyclone

2. Mono-Cyclone

Powder Preparation, Feeding and Application Control Section

3. PXS Powder Center

4. Center application control which operate together with EPG S2 in order to link control function of 2 unit of PEA-C4 per 1 control unit

Powder Applying unit and moving device section

5. Automatic Powder Spray Gun PEA-C4

6. Moving device for 3D moving automatic powder spray gun which is enable to apply with wheel

Powder Booth section and additional area

 

7. C-Cube the powder plastic booth

8. Additional area for extends booths. For example, install the manual coating section.

Area Usage of C-Line Powder Coating

C-Line Comparative Area - ENG.png
C-Line Area ENG.png

Space require is smaller than conventional system

 

  • Complete system up to 60% smaller than the conventional system

  • To compare with between C-Line system and conventional system. The C-Line booth length is 2 meter only.

  • Layout advantages with optimized design

  • Retrofit without system changes for recovery and control

  • Standard configuration with up to 7 m/min line speed.