C-Line system structure

1
2
4
3
5
6
7
8
Powder Recovery Section
1. After Filter for Mono-Cyclone
2. Mono-Cyclone
Powder Preparation, Feeding and Application Control Section
3. PXS Powder Center
4. Center application control which operate together with EPG S2 in order to link control function of 2 unit of PEA-C4 per 1 control unit
Powder Applying unit and moving device section
5. Automatic Powder Spray Gun PEA-C4
6. Moving device for 3D moving automatic powder spray gun which is enable to apply with wheel
Powder Booth section and additional area
7. C-Cube the powder plastic booth
8. Additional area for extends booths. For example, install the manual coating section.
Area Usage of C-Line Powder Coating


Space require is smaller than conventional system
-
Complete system up to 60% smaller than the conventional system
-
To compare with between C-Line system and conventional system. The C-Line booth length is 2 meter only.
-
Layout advantages with optimized design
-
Retrofit without system changes for recovery and control
-
Standard configuration with up to 7 m/min line speed.

Comparative booth between C-Line (up) and conventional booth (below) with heigh angle.